Clean-Up Bins

Clean-Up Bins

Built for efficient concentrate management with controlled drainage and material flow.

Ideal for: Feeding concentrate into the T-150 Cleanup Plant.

1589 Litres
Large Bin Full Capacity
1217 Litres
Small Bin Full Capacity
View Clean-Up Bins
GR-20

GR-20

A compact, turn-key gold room pre-assembled in a 20′ HC container.

Ideal for: Gold operations producing coarse and fine concentrate.

0.5 TON
Processed Per Hour
20 FT
Container Format
View GR-20
GR-40

GR-40

Fully mechanized processing with continuous material handling and less operator attention.

Ideal for: High-volume gold operations with coarse and fine concentrate.

1 TON
Processed Per Hour
40 FT
Container Format
View GR-40
GT-250

GT-250

Stand-alone water recirculation keeps the tabling process clean and easy to operate.

-1 MM
Feed Classification
View GT-250
SD-100

SD-100

Produces classified feed for efficient shaking table or gold wheel operation.

Ideal for: Wet-screening concentrate before tabling.

20-50 LBS
Concentrate Per Batch
10 GPM
Water Requirement
View SD-100
T-150

T-150

Reduces large concentrate volumes to a manageable amount in minutes.

Ideal for: Small testing and cleaning large concentrate volumes.

2,000 LBS
Concentrate in 30–60 min
~20 LB
Reduced Volume
View T-150
Mining equipment designed to work as a system.
Explore our full line of equipment for the production process. From steady feeding and material handling to water, power, gold recovery and cleanup, every machine is backed by parts availability and support after delivery.